SpPz 2 LUCHS: 2. Vorbereitungen Fahrwerk
slightly drill holes
drill axis to the line
wire 0,8mm
intersection points
disconnected
moveable in both directions
moveable in both directions
Vorderachsen fertig - front axles ready
falsche Stoßdämpferfedern - "incorrect" shock absorbers
Material
Federn 'wickeln' - wrap shock absorber
Verbesserte Version - improved version
8 Federn hergestellt - 8 shock absorbers ready
Use my model saw
individual parts
glued
1st look
sanded for more surface area
Work of one day
Bausatzteil - piece of the kit
pre-drill
expand the hole
improve
(now) wrong sprues
eliminated
done
done
im Überblick - overview
Comentarios
27 September 2013, 07:57
Roland Roth
Quite simply, Michael ...
... simply rotate the springs from the screw down - or turn the screw out. And unscrew the springs also from each other ... 😉
Quite simply, Michael ...
... simply rotate the springs from the screw down - or turn the screw out. And unscrew the springs also from each other ... 😉
27 September 2013, 15:21
Roland Roth
Einiges an Vorarbeiten ist gemacht.
A lot of preparatory work is done 👍
Einiges an Vorarbeiten ist gemacht.
A lot of preparatory work is done 👍
28 September 2013, 17:21
Markus Kutsch The Plastic Bench
Watching is your WIP pics. is great.Iam allways curious what comes next.
Top work 👍
Watching is your WIP pics. is great.Iam allways curious what comes next.
Top work 👍
29 September 2013, 03:45
Roland Roth
Weitere (für mich nötige) Detaillung des Fahrwerks (Bilder 24 - 33)
More (needed for me) detailing of the chassis (pic 24 - 33)
Weitere (für mich nötige) Detaillung des Fahrwerks (Bilder 24 - 33)
More (needed for me) detailing of the chassis (pic 24 - 33)
5 October 2013, 13:08
Album info
Das Fahrwerk des Spähpanzers ist halbwegs brauchbar, aber ich möchte es noch verbessern - da es im Detail nicht stimmig ist.
The chassis of the reconnaissance tank is fairly serviceable, but I want to improve it - because it is not quite correct in detail.