Main/tail rotor and armamentnäkymä: Diaesitys Mosaiikki Lista 1January 23, 2018 2January 23, 2018The tail rotor mounting was scratch built, the kit parts were to thick. 3January 23, 2018 4January 23, 2018 5January 23, 2018The lead-lag dampers were also poorly detaild. 6January 23, 2018...so i did one from sheet and copper wire and casted 8 pcs. 7January 23, 2018...looks much better than oob. 8January 23, 2018The AN/APG-78 Longbow Fire Control Radar got some wirering. 9January 23, 2018 10January 23, 2018 11January 23, 2018Pitch control links were scratch built from needles. 12January 23, 2018 13January 23, 2018 14January 23, 2018 15January 29, 2018Next was the M230 gun, kit parts and the barrel from Master. 16January 29, 2018 17January 29, 2018 18January 29, 2018 19January 29, 2018 20February 7, 2018Applied the Eduard AGM-114. 21February 7, 2018 Kommentit 1 23 January 2018, 17:05Project infoApache in Iraq 2003124 kuvien1:72valmistunut5+Kaikki albumitNäytä kaikki albumit »