That's how slowly things are progressing. The engine cover has been drilled out where the hot air outlets are located. The cover of the opening were milled out.
That's how slowly things are progressing. The engine cover has been drilled out where the hot air outlets are located. The cover of the opening were milled out.
Fit test of the engine. Behind the engine additional fastening bolts glued in so that the engine does not sink in the installed state during propeller assembly.