Monument CrabVoir: Diaporama Mosaïque Liste 1March 11, 2020Bogies constructed 2March 11, 2020Bogie with tyre damage and added details 3March 11, 2020Hull with all Dragon’s weld troughs filled 4March 11, 2020Raised weld lines added with putty 5March 11, 2020Remains of Crab fittings added to hull side 6March 11, 2020Replacement engine deck 7March 11, 2020Turret 8March 15, 2020Turret details, with casting numbers 9March 15, 2020Welds added to the hullside fixtures 10March 15, 2020Front mudguards 11April 13, 2020Painted in base colour plus highlights Commentaires 1 11 March 2020, 13:05Album infoConstruction of the present-day version of the (former) Crab.Sherman Crab at Westkapelle, then and now59 images1:35En pause5+Tous les albumsVoir tous les albums »