DKM Scharnhorst
preparing the base
preparing the water
water applied
painting the hull, Baltic stripes still visible
wooddeck applied
scratch building the closed bridge
scratch building the radar platform
scratch building the mast platform
dry fitting the super structure
preparing and updating the hangar
modifying the funnel
modifying the funnel
the water finished
hangar and main super structure painted
turrets assembled
Commentaires
7 18 August 2022, 06:25
Album info
Updating the old Heller Scharnhorst