Rearm and refuel
- Échelle:
- 1:32
- Statut:
- Terminé
- Commencé:
- April 13, 2020
- Terminé:
- December 5, 2024
A P-51 is being rearmed and refueled after a configuration change. The droptanks are being swapped for a pair of bombs. The ammunition crates and fuel drums are already in place. The custombuilt trailer is already put in place and are awaiting the technicians and pilot on a break in the mess facility. Appart from the plane, the drop tanks and the bombs everything else is scratchbuilt.
Inventaire du projet
Maquettes complètes
/fr/search.php?q=*&fkMATEID[]=121074&showast=no&fkWORKBENCH[]=WB121074&page=projects&project=165341?
Albums photos
Commentaires
2 January, 18:12