スケールモデルデータベース | ストックマネージャー
StevenVD
Steven Van Dyck (StevenVD)
BE

Dunkerque class

コメント

29 25 October, 01:17
Steven Van Dyck
For a review on the aftermarket products shown see shipmodels.info/mws_..p;p=1027734#p1027734
25 October, 01:29
Matti Thomaes
Wauw Steven, already a new mahousive project , looking forward to the build, 👍
25 October, 05:48
Ingmar Stöhr
Oh wow! Following!
25 October, 05:57
Gary Victory
Enjoy the Build Steven.
25 October, 06:21
Treehugger
What is the significance, or the meaning of the name 'Jacobsen' on that coin in photo 13? Anyone know? 'Jacobsen' is a more or less common surname.
25 October, 06:42
Steven Van Dyck
Thanks for the interest. For Jacobsen see fr.m.wikipedia.org/wiki/Famille_Jacobsen , it's apparently a family of infamous corsairs also related to Jean Bart. It even mentions the medal at the end.
25 October, 09:18
Steven Van Dyck
Both medals have now arrived. These will be useful as nameplates on the base. One had the description "paquebot Strasbourg", translated as cargo ship, and would be cast in 1950. I started with sanding the hulls to remove the casting traces, these are apparently broken off the sprue leaving two scabs. I noticed one difference, Strasbourg got a degaussing cable. I removed one breakwater from the front deck, taking care not to remove the detail around it. The drilling locations are not very clear, indicator lines passing multiple holes. I started removing Dunkerques sloop rails as I noticed that in the Strasbourg Woodhunter deck there are some PE ones, but now I notice that Shipyard wasn't planning on replacing the plastic rails in their wooden deck. And these rails are lying on the wooden deck, so they're very thin. I'll have to compare very well.
31 October, 11:58
Steven Van Dyck
I wanted to fix Dunkerque's deck. The hull is a bit narrow so I introduced a fitting piece of sprue before I glued the deck in. So there are no unnecessary tensions on the deck. The Shipyard watertight doors are replacing the kit ones, that are actually as detailed as the PE but I saw on pictures that these doors are all placed open. Some drilling is done to open up the doorways. The front of the conning tower should not have much of armour contrary to the rest of it, because only the internal communication channel is armoured. I therefore did not simply glue the PE plating on it, but removed the thick plastic first.
10 November, 00:40
Ingmar Stöhr
You are putting a lot of effort into these! Great work so far!!!
10 November, 06:41
Steven Van Dyck
Thanks, Ingmar. Now the deck of Strasbourg is fixed, but the Bigblueboy set has some extra requirements. The doors now have a backside structure, though not the correct one I suspect. I found a rectangular profile in stead of their diamond pattern. They also request to open up the airplane hangar in two levels. Then the atlantic bow deck is completely covered with a large PE plate sporting the correct anti-slip pattern. It's so nice I rue that it won't be available for Dunkerque, that has got a bland chequered pattern from Hobbyboss.
12 November, 19:40
Steven Van Dyck
The Strasbourg deck is further elaborated. The front splash guard has 32 triangular teeth, but you get 2 spares for each of the instances. So you can lose an entire set without stalling the project. You also get some 2D bitts that I rather changed to 3D, using PE rings and wire. The front deck house is replaced with PE, but it has 8 windows so I painted the inside black. The airplane hangar is a complicated design but it has a fully functional elevator.
16 November, 21:24
Jörg Schäfer
A real Steven Van Dyck, I'll stay on board. 😁
As always, excellent precision.
17 November, 04:44
Ingmar Stöhr
I always like it, if you get some spares for the tiniest parts! As long as there is space on the fret, it doesn't cost the manufacturer anything and it helps calm your nerves.
17 November, 08:58
Steven Van Dyck
Thanks for the attention, today there is much PE work to be seen on Strasbourg. Large anti-skid surfaces are provided, that don't always seem to be carried in reality. This is hard to corroborate because the topside is rarely seen in detail on the pictures, the one I found didn't have it. All doors and bollards for Strasbourg are replaced. I hope to find some for Dunkerque this weekend too when I'm at IPMS Houten, the set for Dunkerque doesn't have these.
19 November, 12:26
Steven Van Dyck
The searchlight platform on both ships is getting wire supports in stead of clunky plastic. Then the Dunkerque funnel is upgraded. I decided to cut a hole in the plastic part under the funnel cap, though I think the grid should have been canted like in the diagram from Wikipedia. But this is so schematic that won't try to change that. Lots of footrails are added, I drilled holes for these.
21 November, 11:50
Steven Van Dyck
A minor setback, in stead of fret G I got twice fret H in the BBB Strasbourg set. What should have been included are most of the smokestack parts you see on Dunkerque already and a lot of railing. But that can be replaced of course.
21 November, 18:18
Ingmar Stöhr
Coming along nicely! Great work with the support pillars and also all the microscopic PE parts! Sorry to hear that you got the wrong sprue. Hope you can sort this out!
21 November, 19:26
Steven Van Dyck
Thanks Ingmar, I was already able to construct most of the Strasbourg smokestack. You can see it in this update together with the Dunkerque conning tower that is growing level by level.
27 November, 17:10
Ingmar Stöhr
You are really keeping up the pace!
27 November, 21:15
Steven Van Dyck
Here I am again, with an update on Dunkerque's superstructure. Some complicated railings to shape, the director top with a radio mast and seven searchlights are all improved with Shipyard. But for the bollards and the anti-skid plates I did an order at MB König. It appears the Flyhawk bollards 1 and 3 can be used. But the IJN anti-skid is too fine so I ordered Ace a-002 now, this should be identical to Strasbourg.
30 November, 01:32
Treehugger
Q1: Have you decided on any one paint scheme? (unsure if you pointed this out in the past)
I think a plain gray would look nicer than one with camo, as a plain gray would I think enhance all the details, while a camo will be distracting I think.

Q2: Any idea if MicroMaster big-turret parts for these ships, are old products or if they were created recently? I think I've seen photos of yellow'ish color.
30 November, 10:10
Steven Van Dyck
I've bought the paint yesterday, it will be Atlantic scheme. These ships were both plain dark grey in their later career, even after arriving in the Mediterranean. For the turrets there is at least this 4 year old link: britmodeller.com/for..que-hobby-boss-1350/
30 November, 11:15
Steven Van Dyck
I scratched a replacement bow plate for Dunkerque, by engraving lots of small lines with a scalpel. Then the piece was hammered and glued to the bow, some holes were filled in. The Flyhawk bollards #2 were a perfect fit, #3 is slightly overscale (test-fit pic 136) so I sunk these in the deck plates for a bit. Now the Strasbourg conning tower is tackled.
2 December, 13:11
Ingmar Stöhr
Wow, nice job on your own makeshift PE!
2 December, 21:07

Project info

139 画像
1:350
進行中
1:350 Dunkerque/Strasbourg Barrels with resin mounts (Master SM-350-101)1:350 Quad 330mm/50 (13") Model 1931 (Micro Master MM0228P)1:350 Quad 330mm/50 (13") Model 1931 (Micro Master MM0226P)6+

すべてのアルバム