Astrakhan Buyan Class Corvette Project 21630
Glued both halves... I knew there was a difference in length, but in width to... more then 1 mm gap between certain parts of lower and upper hull...
more then 1mm in length too... stern looks different then
real situation
real situation
Bitten the bullet
dryfit
and glued... so it takes 24h to dry.. then putty time...
ready for checking with paint
ready for checking with paint
ready for checking with paint
ready for checking with paint
last check
last check
after carving slots where the glue kept protruding and filling them, seems it gave the result I was after
after carving slots where the glue kept protruding and filling them, seems it gave the result I was after
something off... main part should consist of 2 parts, molded as one, PE-part doesn't fit over it
to avoid as much attachments points, I cut my PE at an angle, as close as possible to the part
then I put it between some toothless pliers
sand it flush all around
then some careful cutting, and voila, first weapon ready
a lot of small parts to add
doors and details added
antenna busy to be built up
antenna busy to be built up
general overview
inlet for the turbines, guards still to be added
コメント
17 October 2024, 19:26 -