Hotel facade
Opmerkingen
27 6 September 2023, 08:18
Moritz Fentzahn
First steps done. I shortened a pictureframe and primed the facade. Now on to the fun part
First steps done. I shortened a pictureframe and primed the facade. Now on to the fun part
6 September 2023, 08:20
Moritz Fentzahn
Thanks for your keen interest, mates.
I applied the first colors, now the stuff behind the window.
Thanks for your keen interest, mates.
I applied the first colors, now the stuff behind the window.
7 September 2023, 15:52
Moritz Fentzahn
Acrylic painting done. I started with some enamels, need some more blending and other tones. After that I will add the windows and signs.
Cheers
Acrylic painting done. I started with some enamels, need some more blending and other tones. After that I will add the windows and signs.
Cheers
10 September 2023, 12:40
Spanjaard
Wow, in b/w it was great, in colors is jaw dropping..... and it is not yet finished!
Wow, in b/w it was great, in colors is jaw dropping..... and it is not yet finished!
10 September 2023, 13:32
Bobby Thumbs
amazing as usual moritz - how did you get the cement in between the bricks to pop like that??
amazing as usual moritz - how did you get the cement in between the bricks to pop like that??
11 September 2023, 10:35
Moritz Fentzahn
Thx mate, i used three different ingredients to show different weathered joints. A light grey enamel panel line wash, diluted oil paints and some pigments which I solved in white spirit. The capillary action between the bricks does the work, after that i cleaned some recesses with white spirit and a cotton swap
Thx mate, i used three different ingredients to show different weathered joints. A light grey enamel panel line wash, diluted oil paints and some pigments which I solved in white spirit. The capillary action between the bricks does the work, after that i cleaned some recesses with white spirit and a cotton swap
11 September 2023, 10:51
Moritz Fentzahn
The main work is done. I added the Hotel sign from the box and built a nameplate for the hotel from scratch.
Next step is adding the windows , before I can apply the last touches of weathering goods.
Cheers
The main work is done. I added the Hotel sign from the box and built a nameplate for the hotel from scratch.
Next step is adding the windows , before I can apply the last touches of weathering goods.
Cheers
24 September 2023, 13:23
Bruce Huxtable
Another enigmatic creation, Moritz. Your creativity and craftsmanship are inspirational 👍🙂
Another enigmatic creation, Moritz. Your creativity and craftsmanship are inspirational 👍🙂
24 September 2023, 13:59
Moritz Fentzahn
Thx mates.
@spanjaard, yes I printed the letters, the sign is made from sheet
Thx mates.
@spanjaard, yes I printed the letters, the sign is made from sheet
25 September 2023, 05:37