SAAB J29 F Austrian "Fliegende Tonne"
- Schaal:
- 1:48
- Status:
- Voltooid
- Begonnen:
- February 20, 2019
- Voltooid:
- June 16, 2019
Projectinventaris
Volledig model
/nl/search.php?q=*&fkMATEID[]=10148&showast=no&fkWORKBENCH[]=WB10148&page=projects&project=51379?
Foto albums
Opmerkingen
28 November 2018, 10:29
Roland Sachsenhofer
I started this triple-build a few days ago; construction seems not over-complicated and rather straight ahead. The first three picture depict the interior of a Tunnan I would like to build as a weathered "Gate Guard".... therefore it should look rather rotten 🙂 I tried to improvise some loose cables and wiring, some of the instruments in the dashboard have been drilled out.
All three models will depict Tunnans in Austrian service.
I started this triple-build a few days ago; construction seems not over-complicated and rather straight ahead. The first three picture depict the interior of a Tunnan I would like to build as a weathered "Gate Guard".... therefore it should look rather rotten 🙂 I tried to improvise some loose cables and wiring, some of the instruments in the dashboard have been drilled out.
All three models will depict Tunnans in Austrian service.
17 March 2019, 16:48
Roland Sachsenhofer
I am completely enthusiastic about these model kits! Accuracy of fit, joy in the meaningful detail and a quick assembly are "built in" here. I prefer not to save on bow-weights, because the construction of the Tunnan pre-programmes a tail-sitter. The wings are already finished, so soon the Tunnan will be recognizable.
I am completely enthusiastic about these model kits! Accuracy of fit, joy in the meaningful detail and a quick assembly are "built in" here. I prefer not to save on bow-weights, because the construction of the Tunnan pre-programmes a tail-sitter. The wings are already finished, so soon the Tunnan will be recognizable.
21 March 2019, 18:56
Roland Sachsenhofer
Now this project is finally done! The last of the three Tunnan has got to it´s destination.
The diorama is more of a side issue- moreover: somewhere a gate guard machine has to be, doesn't it? 🙂
I'm really happy to have produced a satisfactory result for all three of them. Thank you for your interest and inspiring comments, guys!
Now this project is finally done! The last of the three Tunnan has got to it´s destination.
The diorama is more of a side issue- moreover: somewhere a gate guard machine has to be, doesn't it? 🙂
I'm really happy to have produced a satisfactory result for all three of them. Thank you for your interest and inspiring comments, guys!
16 June 2019, 13:37