SR-71 Stand build
- 1
September 23, 2020
Power socket removed and cable extended. It is glued in brass tube (8 mm.) with epoxy glue.
- 2
September 26, 2020
Wooden box drilled in 8 mm. diameter for brass tube and on/off switch. Painted with spray can paint aluminium colour.
- 3
October 1, 2020
Battery case and brass tube support fixed with epoxy glue.
- 4
October 1, 2020
Brass tube primed with Vallejo and painted with Tamiya Flat black.
- 5
October 1, 2020
Brass tube and on/off switch placed with epoxy glue. Wires attached.
- 6
October 1, 2020
Brass tube positioned slightly backwards to achieve a nose up attitude.
Kommentarer
1 23 September 2020, 15:16
Album info
Building process of scratch build stand of SR-71 project.
48 bilder
1:72
Fullført
Lockheed M-12/D-21
US Air Force (1947-now)60-6940Desember 1964 - Groom Dry Lake
Alle album
Se alle albumer »