IDF Sherman Ambulance II
![Album image #1 Album image #1](/albums/img/5/7/7/455577-11032-14-720.jpg)
Legend conversion kit
![Album image #2 Album image #2](/albums/img/5/9/5/455595-11032-10-720.jpg)
sprues
![Album image #3 Album image #3](/albums/img/5/9/6/455596-11032-34-720.jpg)
sprues
![Album image #4 Album image #4](/albums/img/5/9/7/455597-11032-95-720.jpg)
sprues
![Album image #5 Album image #5](/albums/img/5/9/8/455598-11032-44-pristine.jpg)
sprues
![Album image #6 Album image #6](/albums/img/5/9/9/455599-11032-30-720.jpg)
sprues
![Album image #7 Album image #7](/albums/img/6/0/0/455600-11032-31-720.jpg)
sprues
![Album image #8 Album image #8](/albums/img/6/4/4/455644-11032-63-720.jpg)
a bit warped, think it is too much for glue alone
![Album image #9 Album image #9](/albums/img/6/4/5/455645-11032-42-720.jpg)
this area need to be removed from the bottom hull to place the overhang? seems like it according to the instructions, but looks weird
![Album image #10 Album image #10](/albums/img/6/4/3/455643-11032-41-pristine.jpg)
tried too straighten the walls with hot water
![Album image #11 Album image #11](/albums/img/6/4/6/455646-11032-56-720.jpg)
tried too straighten the walls with hot water
![Album image #12 Album image #12](/albums/img/6/4/7/455647-11032-18-720.jpg)
dryfit
![Album image #13 Album image #13](/albums/img/6/4/8/455648-11032-32-720.jpg)
dryfit
![Album image #14 Album image #14](/albums/img/3/1/8/461318-11032-41-720.jpg)
those tiny surfaces have to support the total tank, I don't trust it
![Album image #15 Album image #15](/albums/img/3/1/7/461317-11032-85-720.jpg)
gluing surface is only a few mm²
![Album image #16 Album image #16](/albums/img/3/1/9/461319-11032-36-720.jpg)
added some sprue, to drill some holes and add some copperwire. Still need to sad a bit so it looks more descent.
![Album image #17 Album image #17](/albums/img/3/2/0/461320-11032-96-720.jpg)
also in the suspension
![Album image #18 Album image #18](/albums/img/3/2/1/461321-11032-43-720.jpg)
Upper hull mated and started detailing
![Album image #19 Album image #19](/albums/img/3/2/2/461322-11032-55-720.jpg)
Upper hull mated and started detailing
![Album image #20 Album image #20](/albums/img/3/2/3/461323-11032-49-720.jpg)
some messy job still to do here
Comentários
21 March 2018, 10:07
![](/profiles/img/user-s.jpg)
Made some work off the suspension and mated the upper and lower hull. The suspension is very flimsy (six bogey's with only a few square mm's as a glue-joint.) So I added a bit of material so that I was able to drill some holes and reïnforce it with copper wire. Still needs to be tidied up a bit. Friul tracks are also on the way. Manual says there that it should be a wire running completely through the track, but there is a length of wire left and right...
3 April 2018, 11:44