PS sheet was used to replicate armor plates around the bridge and walls.
Wings were only thinned by high-grit sandpaper.
Dashboard needed some rework to fit into place.
superstructure covered by one layer of Mr.SurfacePrimer (1500) to check fittings ans assembly quality (poor).
Also the resin 'chimneys' are fixed to place by CA-glue.
grab rails (on top of day cabin) were done by 0.5mm styrene rods.
20mm Oerlikon AA-gun (on stern) basement is detailed by some rivets (slices of styrene sprue)