M24 Chaffee WIP Pictures
Subassembly complete. The metal barrel included in the kit was a nice touch.
Drilling out the metal track links
Lots of little bits
The metal links have an excellent fit, pretty surprising actually.
Starting to come together, the fully moving aspect of these tracks is pretty amazing
Both tracks done, ready for burnishing.
M2 browning with an added detail set from Aber. I didn't bother with swapping out every PE bit that was included.
I just chose the major details to replace in PE, and it turned out great.
Hull and turret preshaded. Ready for basecoating.
Комментарии
19 October 2024, 04:01 -