база данных по моделизму | управление закромами
mfelsing
MAC FELSING (mfelsing)
US

Trumpeter Bismarck Build - 1st deck forward superstructure

Комментарии

5 23 December 2021, 17:06
Treehugger
Photo 57. Is the presumably self adhesive wooden deck detaching itself from the deck?
7 February 2022, 16:03
MAC FELSING
It is only test fit at this point. Need to prime and paint the deck layers first. Put the boot line on each deck where appropriate and then fasten down the wood decks. Just trying to get all the PE, both on the sides and the top of each deck as well as any plastic parts that need to be on prior to prime and paint.
8 February 2022, 01:37

Album info

This Album fill focus on the forward superstructure PE, painting and installing the wooden deck on the superstructure.

129 изображения
1:200
В работе
1:200 German Bismarck Battleship Upgrade Sets (Trumpeter 06627)1:200 Bismarck 1941 Detail Up Set "Advanced" (Pontos Model 27001F1)1:200 Kriegsmarine crew (Eduard BIG5317)13+

Все альбомы

Посмотреть все альбомы »