DKM Scharnhorst
![Album image #1 Album image #1](/albums/img/1/9/2/1286192-13401-97-720.jpg)
preparing the base
![Album image #2 Album image #2](/albums/img/1/9/3/1286193-13401-96-720.jpg)
preparing the water
![Album image #3 Album image #3](/albums/img/1/9/4/1286194-13401-41-720.jpg)
water applied
![Album image #4 Album image #4](/albums/img/1/9/7/1286197-13401-55-720.jpg)
painting the hull, Baltic stripes still visible
![Album image #5 Album image #5](/albums/img/1/9/8/1286198-13401-36-720.jpg)
wooddeck applied
![Album image #6 Album image #6](/albums/img/1/9/9/1286199-13401-89-720.jpg)
scratch building the closed bridge
![Album image #7 Album image #7](/albums/img/2/0/0/1286200-13401-39-720.jpg)
scratch building the radar platform
![Album image #8 Album image #8](/albums/img/2/0/1/1286201-13401-17-720.jpg)
scratch building the mast platform
![Album image #9 Album image #9](/albums/img/2/0/2/1286202-13401-55-720.jpg)
dry fitting the super structure
![Album image #10 Album image #10](/albums/img/2/0/3/1286203-13401-78-720.jpg)
preparing and updating the hangar
![Album image #11 Album image #11](/albums/img/2/0/4/1286204-13401-19-720.jpg)
modifying the funnel
![Album image #12 Album image #12](/albums/img/2/0/5/1286205-13401-26-720.jpg)
modifying the funnel
![Album image #13 Album image #13](/albums/img/2/0/6/1286206-13401-50-720.jpg)
the water finished
![Album image #14 Album image #14](/albums/img/2/0/7/1286207-13401-93-720.jpg)
hangar and main super structure painted
![Album image #15 Album image #15](/albums/img/2/0/8/1286208-13401-89-720.jpg)
turrets assembled
Комментарии
7 18 August 2022, 06:25
Album info
Updating the old Heller Scharnhorst