databáza modelovania v mierke | správca skrýše
Manic Dragon
Andrea Morris (Manic Dragon)
GB

Airfield Control Tower
Airfix

mierka:
1:76
Postavenie:
dokončený
zahájená:
September 3, 2017
dokončený:
September 11, 2017
Strávený čas:
1 week 1 day

The focal point on any wartime airfield was the control tower. Often a distinctive feature situated in a prominent position close to the runways, the tower housed most of the vital back-up services required to keep the base operational. In it was housed air traffic control, the meteorological office, tele-printer room and general offices. Various types of tower were built, ranging from small two storey brick buildings usually found on fighter stations to the large structures found today.

Zoznam projektov

Kompletné súpravy
03380
Airfield Control Tower with Duty Crew
Airfix 1:76
03380 1994 Nové pole
/sk/search.php?q=*&fkMATEID[]=24497&showast=no&fkWORKBENCH[]=WB24497&page=projects&project=33479?
 
 

Farby projektu

Exterior
031 Slate Grey
Humbrol
14ml ()
Matt
Akryl
091 Black Green
Humbrol
14ml ()
Matt
Smalt
XF-62 Olive Drab
Tamiya
10ml ()
Matt
Akryl
Interior
034 White FS37875
Humbrol
14ml ()
Matt
Smalt
Details
096 R.A.F. Blue
Humbrol
14ml ()
Matt
Smalt
033 Black FS37038
Humbrol
14ml ()
Matt
Smalt
062 Leather FS33275
Humbrol
14ml ()
Matt
Smalt
174 Signal Red (BS381C:537)
Humbrol
14ml ()
satén
Smalt
110 Natural Wood
Humbrol
14ml ()
Matt
Smalt

Fotoalbumy

19 snímky
Airfield Control Tower (Completed)View album, image #1
1:76
Box art
1:76 Airfield Control Tower (Airfix 03380)

Komentáre

30 August 2017, 19:39
Andrea Morris
Please visit the album for comments, updates & pictures for this project.
30 August 2017, 19:39

We use cookies for a great and free experience. By continuing to browse the site you agree to our use of cookies.

Essential cookies are for: preferences, security, performance analytics and contextual advertising.

Privacy policy »   Continue