Street with pylon.
Every dimple on the underside means a pimple on the top to be removed....
Pimples removed, a few holes filled, and also primed.
The pylon is in two sections that will be stacked. This will be the upper, still unpainted
This is the lower section, with paint and weathering started.
The pylon base is no longer square-edged, as I hope to make it look like old concrete
Insulators for telephone wires.
Street light will need a power cable...
Can you spot the difference, apart from the colour?
Colours added to the primed base. I think I've turned it into Harris Tweed!
Trying for different stone for the footpath, from the cobbled road.
From off cuts.
Ready for the next stages....
Kommentarer
8 8 October 2023, 13:09
Bruce Huxtable
Progressing the painting was too tempting, so the base has progressed ahead of assembly of the walls.
Progressing the painting was too tempting, so the base has progressed ahead of assembly of the walls.
14 October 2023, 15:18