Workable tracks. Three connection points per link.
At first I thought I had to use a thick cement like the tube stuff but that's just too cumbersome to work with. I tried CA and that did work but in the end I just used Tamiya Extra Thin _sparingly_ as it was just easier.
Fitting the upper hull superstructure to the lower required a bit of finesse. The right side was so tight between the turret and engine. I needed to force the pieces down and use CA. I suspect it was because I glued the transmission cover first as per the instructions before I got to assembling the upper superstructures.
RFM workable tracks are decent. A bit delicate.. longer track pins would be better for strength and ease of assembly. NOTE: instructions say build 91 links per side but that's too long. I found 89 links suitable.
Track finishing.. XF-64 Red Brown base. AK Track wash. Base colour was an experiment, AK track wash always looks great even without additional weathering.
X-11 and 2B pencil weathering. Black pigment rubbed along road wheel path.
Experimented with using Metallic Gray XF-56 for the spare tracks. Then weathered with AK Track Wash, Ammo MIG Streaking Grime & Rust Effects washes and MIG Subtle Dirt Filter.