June 3, 2024Running gear assembled2
June 3, 2024Main fuselage assembled, waiting on the Transmission to get installed.3
June 3, 2024Designed something in Tinkercad to play the part of the transmission. Need to build out floor and a "firewall". The main parts are here however.
4
June 3, 2024Actual tank that is being built. From Tarawa 19445
June 7, 2024Transmission test fit into the hull. Hatches will be open so it needs something to fill the space.
6
June 7, 20247
June 7, 20248
June 7, 2024Opened up. Will look much better painted, need to put in a firewall (not sure what to call it) and some controls as well as brake pads.9
June 16, 2024Spring made out of copper wire10
June 16, 2024Transmission installed
11
June 16, 2024Some paint added and a few details
12
June 16, 202413
June 16, 202414
June 16, 2024Assembled 3D printed stuff15
June 27, 2024Assembly of Friul tracks.16
June 27, 2024Original bag of tracks for one side of the model.17
June 27, 2024Started with strips after cleaning up the parts. Substituted copper wire for the brass that came with it. Mixes feelings about that. The copper is so soft that if you need to apply any pressure it bends very easily.18
June 27, 2024Added some texture to the body.19
June 27, 202420
June 27, 202421
June 27, 2024One side track completed22
June 27, 2024Close up of the finished track.