ölçekli modelleme veritabanı | depo yöneticisi
Profa
Zoran Jakovljevic (Profa)
RS

Pfalz A.I

Yorumlar

1 23 May 2013, 08:22
Zoran Jakovljevic
Almost completed works on interior, tonight's time for closing the fuselage 🙂
23 May 2013, 19:48
Zoran Jakovljevic
Yesterday I have added additional details (throttle handle, instruments...) and closed the fuselage. It required not-so-standard quantity of filler 🤔, and now it's time for filling&sanding...
24 May 2013, 18:09
Zoran Jakovljevic
Finally finished painting and added decals...
It'll dry a bit, and then goes mat coat and a bit of weathering
29 June 2013, 08:59
Zoran Jakovljevic
After marker bled through I've corrected all paint job, attached engine w/ cowling, landing gear (which had to be modified) and wings... Today hope to release the spider to weave the net 🙂
11 July 2013, 06:00
Zoran Jakovljevic
finished, finally, and off to the shelf it goes...
2 August 2013, 08:40
Philip De Keyser
Beautiful job Zoran 👍
2 August 2013, 09:11
Zoran Jakovljevic
Thanks, Philip! 🙂
2 August 2013, 09:53
Wim van der Luijt
very nice...I think rigging would kill my nerves and this has always stopped me from tackling these beautifull WWI planes
2 August 2013, 09:59
Tim Vereecke
well done 👍
2 August 2013, 16:44
Dirk Heyer
Hi Zoran,
a wonderful work in Braille scale!!
Scale effect of the bracing is fabulous!
👍 👍 👍 👍 👍 👍 👍

2 August 2013, 18:53
Zoran Jakovljevic
Thanks everybody 🙂
This rigging is easily done if you have the right material - elastic line, commercially known as lycra. It took me 30 minutes to do it.😉
2 August 2013, 23:10
Wim van der Luijt
really....Lycra used to be made at my workplace!...small world!
3 August 2013, 18:17

Album info

Build log of AZ Model Pfalz A.I, in colors of F.Fl.Abt.9b, July 1915.

24 Görüntüler
1:72
Tamamlanan
1:72 Pfalz A.I (AZmodel AZ7279)

Tüm albümler

Tüm albümleri görüntüle »