Main/tail rotor and armament
1
January 23, 20182
January 23, 2018The tail rotor mounting was scratch built, the kit parts were to thick.3
January 23, 20184
January 23, 20185
January 23, 2018The lead-lag dampers were also poorly detaild.6
January 23, 2018...so i did one from sheet and copper wire and casted 8 pcs.7
January 23, 2018...looks much better than oob.8
January 23, 2018The AN/APG-78 Longbow Fire Control Radar got some wirering.9
January 23, 201810
January 23, 201811
January 23, 2018Pitch control links were scratch built from needles.12
January 23, 201813
January 23, 201814
January 23, 201815
January 29, 2018Next was the M230 gun, kit parts and the barrel from Master.16
January 29, 201817
January 29, 201818
January 29, 201819
January 29, 201820
February 7, 2018Applied the Eduard AGM-114.21
February 7, 2018
评论
1 23 January 2018, 17:05