Me-109G-10
1
March 14, 2018Top completed and masked for painting the lower surfaces.2
March 14, 2018Top completed and masked for painting the lower surfaces.3
March 14, 2018Top and bottom completed, nose is next.4
March 14, 2018Bare metal on lower wings.5
March 14, 2018"Unpainted" lower surfaces.6
March 14, 2018Nose, spinner, and prop painted.7
March 26, 2018Decals completed.8
March 26, 2018Decals completed.9
April 4, 2018Panel lines completed.10
April 4, 2018Panel lines completed.11
April 4, 2018Panel lines completed.12
April 6, 201813
April 6, 201814
April 6, 201815
April 6, 201816
April 6, 201817
April 6, 201818
April 6, 201819
April 6, 201820
April 6, 2018
评论
14 March 2018, 01:42
Album info
Repainting a kit built over two decades ago.
20 图片